No | Clients | Work Description | Duration | Name of Referees | Details and Number of the Air Conditioning units installed BTU |
---|---|---|---|---|---|
1 | Petronas Carigali S/B TCOT (Terengganu Crude Oil Terminal) | Supply and Install Centralised Air-Conditioning System | In –progress From October 2012 | 1) Rosly Hj Mat Nor 2) Zubaidah | Air cooled unit 400,000 BTU 3 units |
2 | EPCOS Sdn. Bhd. | Chemical Cleaning for FCU | 28/6/2012 Done | 1) Rhizam 2) Azman | Fan Coil Unit 40,000 BTU 2 units |
3 | Talisman Malaysia Ltd (Enhance Track Sdn Bhd) | Supply and Install HVAC Duct Heater panel | 6/6/2012 –28/8/2012 Done | 1) Abi Sufian Zainuddin 2) Gary Fernandez | - |
4 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Supply Labour, Tools & Materials for Pipe Freezing at PTP Cooling Tower and Chillers | 23/5/2012-25/6/2012 Done | 1) Norman Ismail 2) Musa Abd Wahab | Chiller Carrier 350 Ton 4 Units |
5 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | PM for ACMV at Port of Tanjung Pelepas (1 month ) | 22/3/2012 – 25/6/2012 Done | 1) Norman Ismail 2) Musa Abd Wahab | Split Unit 10,000 BTU 30 Units Fan Coil Units 54000 BTU 6 units |
6 | Petronas Carigali – SKO Sarawak Operations | Provision Of Design, Supply, Delivery, Fabrication, Installation, Hook Up & Commissioning Of A Heating, Ventilated And Air Conditioning (HVAC) AT D-35PG-A For Petronas Carigali S/B | In-progress (from March 2012) | 1) M Zuhadi B Shamsuddin 2) Idi Irawan B M Yusof | AHU 341,000 BTU 2 Units ACCU 3 Units |
7 | UDA Angsana Sdn Bhd | To Supply Labour, Tools & Materials for Repair Chiller No5 . | 1/2/2012 Done | 1) Noordin | Chiller Carrier 450 Ton 1 Unit |
8 | Petronas Penapisan Melaka Sdn Bhd (Accrete Engineering) | Design HVAC systems for New Blast Proof Building and SCR4 Extension at Petronas Penapisan Melaka | 1/8/2011 Done | 1) Rosly Hj Mat Nor 2) Mohd Shawalludin | Air Cooled Chiller York 500,000 BTU 1 unit |
9 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | 2 Years Contract of Monthly Maintenance of the Kitchen Ducting at PAB, PUB & Seaman Centre at Pelabuhan Tanjung Pelepas | Oct 2011 – Oct 2013 | 1) Norman Ismail 2) Musa Abd Wahab | Exhaust Fan 20 HP |
10 | Seagate International (Johor) Sdn. Bhd. | 1 years Contract of Monthly Maintenance of the HVAC systems for Seagate Factories | March 2011 Done | 1) Syahrul Ridza Ariffin | Split Unit Fan Coil Unit |
11 | JST Connectors (Malaysia) Sdn Bhd | Servicing carrier centrifugal chillers | Completed October 2011 | 1) Hazlan 2) Hairul | Water Cooled Chiller Carrier 350 Ton |
12 | Talisman Malaysia Ltd (Enhance Track Sdn Bhd) | Fabricate, supply, install, testing and commissioning of Condenser DX copper coil for 4 units of air-cooled chillers | Completed October 2011 | 1) Abi Sufian Zainuddin 2) Gary Fernandez | Air Cooled Unit 300,000 BTU 4 units |
13 | Talisman Malaysia Ltd (Enhance Track Sdn Bhd) | Fabricate, supply, install, test and commission Condenser DX copper coil for air-cooled chiller | Completed October 2011 | 1) Abi Sufian Zainuddin 2) Gary Fernandez | Air Cooled 300,000BTU 1 unit |
14 | The Legends Golf & Country Resort | Servicing of chiller water pump | Completed July 2011 | 1) Nasaruddin 2) Ajis | Air Cooled Chiller 2 Units Trane |
15 | EPCOS Sdn. Bhd. | Services for ASCU and cooling tower | Completed July 2011 | 1) Rhizam 2) Azman | ACSU 20 Units Cooling Tower 2 Units |
16 | Tesco Store Kulai - Total Solutions M&E Sdn Bhd | Maintenance services for AC equipment at Tesco Store Kulai | Completed May 2011 | 1) Aivon Loh | ACSU FCU AHU |
17 | Tesco Store Kulai - Total Solutions M&E Sdn Bhd | Maintenance services for AC equipment at Tesco Store Kulai | Completed April 2011 | 1) Aivon Loh | ACSU FCU AHU |
18 | EPCOS Sdn. Bhd. | Services for FCUs | Completed April 2011 | 1) Rhizam Md Zin 2) Azman | FAN COIL UNIT 70,000 BTU 6 UNIT |
19 | EPCOS Sdn. Bhd. | Services for FCUs | Completed March 2011 | 1) Rhizam Md Zin 2) Azman | Air Cooled Split Unit, 20,000 BTU 10 Units |
20 | Tesco Store Kulai - Total Solutions M&E Sdn Bhd | Maintenance services for AC equipment at Tesco Store Kulai | Completed March 2011 | 1) Mohammad Ali | Air Cooled Split Unit 20,000 Btu 15 Units |
21 | The Legends Golf & Country Resort | Services for maintenance shutdown for 2 units of Trane Air-Cooled Chillers | Completed March 2011 | 1) Nasaruddin 2) Ajis | Air Colled Chiller 250 Ton 2 Units |
22 | JST Connectors (Malaysia) S/B | Services for cooling tower 4 at I-Plant | Completed March 2011 | 1) Hazlan 2) Hairul | Cooling Tower 350 Ton 3 Units |
23 | JST Connectors (Malaysia) S/B | Services for cooling tower 1 at I-Plant | Completed February 2011 | 1) Hazlan 2) Hairul | COOLING TOWER 250 TON 1 UNIT |
24 | Talisman Malaysia Ltd (RHS Tech Corporation Sdn Bhd) | Supply of motorized fire dampers, cable glands and lugs for Talisman's Bunga Orkid A | Completed February 2011 | 1) Abi Sufian Zainuddin 2) Gary Fernandez | - |
25 | AEON Co. (M) Sdn Bhd - Jusco Tebrau City | Services for AHU cooling coil chemical cleaning | Completed February 2011 | 1) Adam Mansur | AIR HANDLING UNIT 400,000 BTU 1 UNIT |
26 | EPCOS Sdn. Bhd. | Supply, install, testing and commissioning of sprinkler heads for cooling tower | Completed February 2011 | 1) Rhizam Md Zin 2) Azman | SPARE PART COOLING TOWER 50 TON 1 UNIT |
27 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | Services to install 2 units of compressors for Quay Crane 27 AC system | Completed January 2011 | 1) Norman Ismail 2) Musa Abd Wahab | COMPRESSOR 125,000 BTU 1 UNIT |
28 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | Services for Daikin VRV system | Completed January 2011 | 1) Norman Ismail 2) Musa Abd Wahab | VRV 50,000 BTU 4 UNIT |
29 | RHS Tech Corporation Sdn Bhd | Supply and install thermal expansion valves, suction services valves, discharge service valves and solenoid valves at Talisman's SA-A | Completed January 2011 | 1) Abi Sufian Zainuddin 2) Gary Fernandez | - |
30 | Esso Malaysia Bhd (Port Dickson) - through AlamDingin Air Conditioning Engineering | Relocate and install AC for Analyzer Shelter no. 2 | Completed January 2011 | 1) Mohd Kamal 2) Shahibrahim | FLOOR STANDING 50,000 BTU 1 UNIT |
31 | Kompleks Operasi Petronas - Accrete Services Sdn Bhd | Installation, testing and commissioning works for new installation water cooled package unit at Kompleks Operasi Petronas, Kerteh, Terengganu | Completed December 2010 | 1) Rosli Abdullah | WATER COOLED PACKAGE UNIT 70,000 BTU 5 UNIT |
32 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | Services for cooling towers CTA 1350 & 150 | Completed December 2010 | 1) Norman Ismail 2) Musa Abd Wahab | CHILLER SYSTEM 350 TON 4 UNIT |
33 | JST Connectors (Malaysia) Sdn Bhd | Installation of new unit of Truwater Cooling Tower 4 infill at I-Plant | Completed December 2010 | 1) Hazlan 2) Hairul | CHILLER CARRIER 350 TON 3 UNIT |
34 | JST Connectors (Malaysia) Sdn Bhd | Installation of new unit of Truwater Cooling Tower 1 infill at I-Plant | Completed November 2010 | 1) Hazlan 2) Hairul | CHILLER CARRIER 350 TON 1 UNIT |
35 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | Supply, replace, install, testing and commissioning fan bearings for cooling tower 1 & 3 | Completed November 2010 | 1) Norman Ismail 2) Musa Abd Wahab | COOLING TOWER 350 TON 2 UNIT |
36 | Sutera Mall Management Johor Bahru | Services for FCU systems | Completed October 2010 | 1) Rizam | FAN COIL UNIT 50,000 BTU 30 UNIT |
37 | EPCOS Sdn. Bhd. | Services for ASCU units | Completed September 2010 | 1) Rhizam Md Zin 2) Azman | AIR COOLED SPLIT UNIT 20,000 BTU 15 UNIT |
38 | EPCOS Sdn. Bhd. | Services for cooling tower | Completed August 2010 | 1) Rhizam Md Zin 2) Azman | COOLINT TOWER 20 TON 1 UNIT |
39 | EPCOS Sdn. Bhd. | Supply, install, testing and commissioning heating element for WCPU - BE air cond unit | Completed August 2010 | 1) Rhizam Md Zin 2) Azman | WATER COOLED PACKAGE 30,000 BTU 1 UNIT |
40 | The Legends Golf & Country Resort | Supply, replace and install motor pulley for AHU unit | Completed July 2010 | 1) Nasaruddin 2) Ajis | AHU 200,000 BTU 1 Unit |
41 | Talisman Malaysia Ltd (SAAG Oil & Gas Sdn Bhd) | Services for HVAC unit for ECR Room at BRE | Completed June 2010 | 1) Abi Sufian Zainuddin 2) Gary Fernandez | - |
42 | JST Connectors (Malaysia) S/B | Services for chiller system units at U-Plant | Completed May 2010 | 1) Hazlan 2) Hairul | Chiller Carrier 350 Ton x 2 Units |
43 | Shanghai Zhenhua Heavy Industry Co Ltd - PTP ZPMC Quay Crane | Supply, install, test and commission AC motor controller for HVAC unit | Completed March 2010 | 1) Yang Mue Xue | - |
44 | Kelana Megah Sdn Bhd - The Zon Johor Bahru | Supply parts and replace filter core, compressor oil and refrigerant for chillers 3 & 4 | Completed January 2010 | Completed January 2010 | - |
45 | PNB Commercial Sdn Bhd | Supply, install, test and commission water pressure switch and gauge | Completed January 2010 | 1) Mohd Hasri | - |
46 | Talisman Malaysia Ltd (SAAG Oil & Gas Sdn Bhd) | Supply, install, test and commission thermal expansion valve and filter drier | Completed January 2010 | 1) Abi Sufian Zainuddin 2) Gary Fernandez | - |
47 | EPCOS Sdn. Bhd. | Supply, install, test and commission condenser fan motor for outdoor unit | Completed December 2009 | 1) Rhizam Md Zin 2) Azman | - |
48 | The Legends Golf & Country Resort | Supply, replace and install Oil Service Valve for Trane Air Cooled Chiller | Completed December 2009 | 1) Nasaruddin 2) Ajis | - |
49 | PNB Commercial Sdn Bhd | Supply, install, test and commission condensor fan motor for outdoor unit | Completed November 2009 | 1) Mohd Hasri | - |
50 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | Supply, install, test and commission Air Receiver Tank and arrange DOSH inspection for Vertical Air Receivers 1000 and 750 litres | Completed November 2009 | 1) Norman Ismail 2) Musa Abd Wahab | - |
51 | Pelabuhan Tanjung Pelepas S/B. | Services for ZPMC Quay Crane's AC compressor | Completed November 2009 | 1) Norman Ismail 2) Musa Abd Wahab | - |
52 | Kalmar (Malaysia) Sdn Bhd | Supply, install, testing and commissiong PC Board for ACSU | Completed October 2009 | 1) Norman Ismail 2) Musa Abd Wahab | - |
53 | EPCOS Sdn. Bhd. | Dismantle and resintall existing split unit including testing and commissioning | Completed September 2009 | 1) Rhizam Md Zin 2) Azman | - |
54 | Kelana Megah Sdn Bhd - The Zon Johor Bahru | Services chemical cleaning for FCU units | Completed August 2009 | - | - |
55 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | Supply, install, testing and commissioning refrigerant suction pipe for Impsa Quay Crane | Completed July 2009 | 1) Norman Ismail 2) Musa Abd Wahab | - |
56 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | Supply, install, testing and commissioning oil separator for air cond compressor at Impsa Quay Cranes | Completed July 2009 | 1) Norman Ismail 2) Musa Abd Wahab | - |
57 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | Supply, dismantle, install, testing and commissioning oil separator for Impsa Quay Crane's Air Cond Unit | Completed July 2009 | 1) Norman Ismail 2) Musa Abd Wahab | - |
58 | EPCOS Sdn. Bhd. | Supply, remove and install insulation for ducting systems and also do chemical cleaning for FCU | Completed July 2009 | 1) Rhizam 2) Azman | - |
59 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | Supply, install, testing and commissioning Vertical Air Receiver 1,000 litres | Completed July 2009 | 1) Norman Ismail 2) Musa Abd Wahab | - |
60 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | Services to install compressor for Impsa Quay Crane | Completed June 2009 | 1) Norman Ismail 2) Musa Abd Wahab | - |
61 | EPCOS Sdn. Bhd. | Supply manifold gauges, repair, install, testing and commissioning Clean Room Chiller. | Completed June 2009 | 1) Rhizam 2) Azman | - |
62 | EPCOS Sdn. Bhd. | Supply, dismantle, install fan bearings including testing and commissioning | Completed June 2009 | 1) Rhizam 2) Azman | - |
63 | The Legends Golf & Country Resort | Supply, replace and install valve liquid line for Trane Air Cooled Chiller | Completed June 2009 | 1) Nasaruddin 2) Ajis | - |
64 | Hospital Sultanah Aminah Johor Bahru | Supply, install, testing and commissioning 20 split units of air conditioners for offices | Completed May 2009 | 1) Mohd Idham | - |
65 | The Legends Golf & Country Resort | Supply, replace parts, testing and commissioning of Trane Air Cooled Chiller | Completed February 2009 | 1) Nasaruddin 2) Ajis | - |
66 | The Legends Golf & Country Resort | Services for Annual Preventive Shutdown Maintenance for Trane Air Cooled Chiller | Completed January 2009 | 1) Nasaruddin 2) Ajis | - |
67 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Dismantle, Supply & Install New Bearing Housing for 1 nos Cooling Tower | December 2008 - January 2009 | 1) Mohd Nazaruddin 2) Norman Ismail | - |
68 | Talisman Malaysia Ltd ( SAAG Oil & Gas Sdn Bhd) | To Supply, Install, Testing & Commissioning 1 nos ACSU Carrier for BRD | November 2008 - December 2008 | 1) Gary Patrick 2) Govindarajoo | - |
69 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | Repair Works for Ventilation System At Substation 12 in PTP | October 2008 - November 2008 | 1) Ali Akbar Amat 2) Norman Ismail | - |
70 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Overhaul Carrier Compressor Model 06E4250310 | October 2008 - November 2008 | 1) Siti Aminah Ahmad 2) Norman Ismail | - |
71 | Amerstrand Engineering Sdn Bhd | To Supply, Install, Testing & Commissioning Carrier ACSU with Heresite Coating | September 2008 - October 2008 | 1) Asmawi Bujang | - |
72 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Carry-out Chemical Cleaning for AHU Condensor Coils and Fan Coil Units at Cafeteria PAB | August 2008 - September 2008 | 1) Mohd Nazaruddin 2) Norman Ismail | - |
73 | Pelangi Berhad | To Supply Labour & Parts for Dismanling and Install Brand New Blower Unit | August 2008 - September 2008 | 1) Mohd Asri Othman | - |
74 | AMP Corporation (M) Sdn Bhd | To Supply, Install, Testing & Commissioning Carrier ACSU with Heresite Coating | July 2008 - August 2008 | 1) Nordin | - |
75 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Supply, Install, Test & Commission Split Unit Air Cond Units (Inverter Type) for Port Gate A and Weightbridge Cabin | June 2008 - August 2008 | 1) Mohd Nazaruddin 2) Norman Ismail | - |
76 | Talisman Malaysia Ltd (SAAG Oil & Gas Sdn Bhd) | Repair & Rewinding Works for Compressor c/w Parts Replacement | June 2008 - August 2008 | 1) Gary Patrick 2) Govindarajoo | - |
77 | Menara Landmark Management | Supply Labour, Tools & Parts To Carry-out Maintenance Service for Trane Chiller No.1 | May 2008 - June 2008 | 1) Azmi Ismail | - |
78 | EPCOS Sdn. Bhd. | To Overhaul 29kW Chiller Compressor | May 2008 - June 2008 | 1) Rhizam Md Zin 2) Azman | - |
79 | Talisman Malaysia Ltd (SAAG Oil & Gas Sdn Bhd) | Mobilization & Demobilization of 2 Technicians to BRE for ASCU Repair Works | April 2008 - April 2008 | 1) Gary Patrick 2) Govindarajoo | - |
80 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | Supply, Install, Testing and Commissioning of Air-Cooled Package At PTP | March 2008 - May 2008 | 1) Bahaman 2) Norman Ismail | - |
81 | Talisman Malaysia Ltd (SAAG Oil & Gas Sdn Bhd) | To Supply Parts, Labour Including Testing & Commissioning for Compressor at South Angsi A | March 2008 - May 2008 | 1) Gary Patrick 2) Govindarajoo | - |
82 | Talisman Malaysia Ltd (SAAG Oil & Gas Sdn Bhd) | Compressors Rework for South Angsi A | January 2008 - February 2008 | 1) Gary Patrick 2) Govindarajoo | - |
83 | Talisman Malaysia Ltd (SAAG Oil & Gas Sdn Bhd) | Compressor Oil Heater Rework | December 2007 - December 2007 | 1) Gary Patrick 2) Govindarajoo | - |
84 | Talisman Malaysia Ltd (SAAG Oil & Gas Sdn Bhd) | To Supply Parts, Labour Including Testing & Commissioning for Compressor at BRA | October 2007 - November 2007 | 1) Gary Patrick 2) Govindarajoo | - |
85 | MMHE Sdn Bhd - BRE (Through HaniTEK Sdn Bhd) | Trouble Shooting for HVAC Equipment of South Angsi Platform | October 2007 - November 2007 | 1) Zamri | - |
86 | MMHE Sdn Bhd - FSO Orkid | To Supply & Install 4 nos Oil Separators for FSO Orkid | September 2008 - October 2008 | 1) Donny Chong | - |
87 | UDA Angsana Sdn Bhd | To Supply, Install & Replace Lead Display Module (LID) For Chiller No. 4 | September 2007 - September 2007 | 1) Hasnizi Pauzi 2) Mustafa Abdullah | - |
88 | Pelangi Berhad | To Supply, Install, Testing & Commissioning Blower Units | August 2008 - August 2008 | 1) Aminuddin Ismail 2) Shahrol Azman Abd Kahar | - |
89 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Supply, Install, Testing & Commissioning 1 nos ACSU Carrier | August 2008 - August 2008 | 1) Mohd Nazaruddin 2) Norman Ismail | - |
90 | UDA Angsana Sdn Bhd | Installation, Testing & Commissioning of AHU Coil in UDA Angsana Mall | April 2007 - April 2007 | 1) Hasnizi Pauzi 2) Mustafa Abdullah | - |
91 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | One year Maintenance Service For HVAC Systems At Pelabuhan Tanjung Pelepas | June 2007 - May 2008 | 1) Mohd Nazaruddin 2) Norman Ismail | - |
92 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | Maintenance Works - To Carry-out Air Balancing for HVAC System at PAB | July 2007 - Spetember 2007 | 1) Mohd Nazaruddin 2) Norman Ismail | - |
93 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Remove and Replace Damage Flexible Ducting and Additional Ventilation Exhaust Fan Ducting System | May 2007 - July 2007 | 1) Mohd Nazaruddin 2) Norman Ismail | - |
94 | MMHE Sdn Bhd - BRE (Through Grace Theme Sdn Bhd) | To Install, Testing & Commissioning HVAC Equipment For Cold Room for BRE Oil Platform | June 2007 - July 2007 | 1) Razak | - |
95 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To carry-out Maintenance for All Ventilation Systems at Cafeterias and Substations | May 2007 - June 2007 | 1) Mohd Nazaruddin 2) Norman Ismail | - |
96 | UDA Angsana Sdn Bhd | To Supply, Install & Replace Lead Display Module (LID) For Chiller No. 2 | May 2007 - May 2007 | 1) Hasnizi Pauzi 2) Mustafa Abdullah | - |
97 | MMHE Sdn Bhd - BRE (Through Grace Theme Sdn Bhd) | To Install, Testing & Commissioning Electrical Wiring For Cold Room for BRE | May 2007 - May 2007 | 1) Razak | - |
98 | MMHE Sdn Bhd - BRE (Through Grace Theme Sdn Bhd) | To Install, Testing & Commissioning HVAC Equipment For Cold Room for BRE | May 2007 - May 2007 | 1) Razak | - |
99 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | Maintenance Works - To Remove & Replace Existing AHU & FCU Filter Mat Cartridges at PAB & CoAB | April 2007 - May 2007 | 1) Ali Akbar Amat 2) Norman Ismail | - |
100 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Supply, Install, Testing & Commissioning Split Units (Cassette type) for SCADA room, CCTV room, Workshop room & Security Meeting room. | March 2007 - June 2007 | 1) Mohd Nazaruddin 2) Norman Ismail | - |
101 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Overhaul Carrier Reciprocating Compressor | March 2007 - June 2007 | 1) Mohd Nazaruddin 2) Norman Ismail | - |
102 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Supply New Blower Wheel Including Air Balancing Work | February 2007 - March 2007 | 1) Mohd Nazaruddin 2) Norman Ismail | - |
103 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Supply, Install, Testing & Commissioning 4 nos Ventilation Fans at Staircase and Prayer Rooms. | February 2007 - March 2007 | 1) Mohd Nazaruddin 2) Norman Ismail | - |
104 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Carry-out Maintenance for the FCU Units for the PAB Service Wing and Port Briefing Room | February 2007 - March 2007 | 1) Mohd Nazaruddin 2) Norman Ismail | - |
105 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | Supply and Install Thermal Expansion Valves for Quay Crane No. 23 | February 2007 - March 2007 | 1) Lily Azreen 2) Sim Keng Hiong | - |
106 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Supply Labour & Parts for the Maintenance of Freezers | December 2006 - December 2006 | 1) Norman Ismail 2) Musa Abd Wahab | - |
107 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Supply Labour For Installation, Testing & Commissioning 6 nos Air Curtain for PAB Cafeteria | December 2006 - December 2006 | 1) Mohd Nazaruddin 2) Norman Ismail | - |
108 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Replace, Supply, Install, Testing & Commisioning 1 nos Compressor for M&R Department | December 2005 - December 2006 | 1) Mohd Nazaruddin 2) Norman Ismail | - |
109 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Supply, Remove & Replace Cooling Tower Basin for Chiller Water System | August 2005 - September 2005 | 1) Juraimi Masood 2) Norman Ismail | - |
110 | The Legends Golf & Country Resort | Proposal for Annual Preventive Shutdown Maintenance for Trane Air-Cooled Screw Chiller (3 Nos) | July 2005 - August 2005 | 1) Mohammd Yahya Arshad | - |
111 | Pelabuhan Tanjung Pelepas Sdn. Bhd. | To Carry-out HVAC Ducting Cleaning At Port Admin Building (PAB) and Custom Operation Admin Building (CoAB) | March 2005 - July 2005 | 1) Lily Azreen 2) Norman Ismail | - |